<?xml version="1.0" encoding="utf-8"?>
								<rss version="2.0">
								<channel>
								<title>Airedale Mechanical and Electrical. RSS 2.0 News Feed</title>
								<link>http://www.airedale.uk.com/</link>
								<description>The latest 10 news stories from Airedale Mechanical and Electrical</description>
								<lastBuildDate>Tue, 08 May 2012 08:38:19 GMT</lastBuildDate>
								<language>en-us</language>
					<item>
									<title>60 Holborn Viaduct - London</title>
									<link>http://www.airedale.uk.com/news.php#news78</link>
									<guid>http://www.airedale.uk.com/news.php#news78</guid>
									<pubDate>Tue, 08 May 2012 08:34:50 GMT</pubDate>
									<description>01/05/12

Airedale Mechanical &amp; Electrical Ltd have been awarded the installation for the of the Mechanical &amp; Electrical Services for 60 Holborn Viaduct Office Development in Central London on behalf of  Balfour Beatty Construction.

The new commercial building will provide over 215,000 sq ft of high quality, energy efficient office space across nine levels with retail on the ground floor which has been design to achieve a Breeam rating of \\\'Excellent\\\'.

The £10m of M&amp;E services are due to commence in Summer 2012.</description>
									</item>
					<item>
									<title>Airedale Maintenance Services Ltd secure 5 year deal with East Riding College</title>
									<link>http://www.airedale.uk.com/news.php#news77</link>
									<guid>http://www.airedale.uk.com/news.php#news77</guid>
									<pubDate>Fri, 10 Feb 2012 12:26:41 GMT</pubDate>
									<description>10/02/12

Airedale Maintenance Services Ltd have been awarded the on-going Mechanical &amp; Electrical Maintenance contract at East Riding College, Bridlington for a further 5 years.  This is an extension to the initial 12 month period which also included Warranty Management on behalf of Airedale Mechanical &amp; Electrical Ltd who designed &amp; installed the environmentally friendly and sustainable mechanical and electrical services.

The mechanical and electrical services which include ground source heat pumps, solar energy, air conditioning, gas fired heating, lighting, emergency lighting and general power will be maintained in accordance with all current legislation in order to ensure the building operates at its optimum, the students / staff are comfortable and full legal and statutory compliance is maintained.

Speaking about the award of this contract Adam Wider (Operations Manager) commented “East Riding College are quickly becoming a leader in the economic and social development of the region and so to have secured such a long term relationship with such a quality and progressive Client in the current climate is fantastic news. We are excited at the prospect of continuing with our strong working relationship with East Riding College”.</description>
									</item>
					<item>
									<title>Airedale bag further Student Accommodation</title>
									<link>http://www.airedale.uk.com/news.php#news76</link>
									<guid>http://www.airedale.uk.com/news.php#news76</guid>
									<pubDate>Tue, 31 Jan 2012 22:01:15 GMT</pubDate>
									<description>01/02/12

Airedale Mechanical &amp; Electrical Ltd have been awarded the design and installation for the New Fountains Bridge Student Accommodation Project in Edinburgh on behalf of Main Contractor Pochin Construction.

The £5m of M&amp;E services are due to commence in Summer 2012.</description>
									</item>
					<item>
									<title>Airedale secure two new projects within the Education Sector</title>
									<link>http://www.airedale.uk.com/news.php#news75</link>
									<guid>http://www.airedale.uk.com/news.php#news75</guid>
									<pubDate>Mon, 23 Jan 2012 15:11:28 GMT</pubDate>
									<description>19/01/12

Airedale Mechanical &amp; Electrical Ltd have been awarded the design and installation for the new Outwood Academy in Doncaster, on behalf of Main Contractor Wates Construction. The Development is for the replacement of the existing school with associated access, landscaping and sports pitches including the demolition of the existing school buildings.

The second award is for the installation and coordination of new M&amp;E Service to The Grange School Runcorn on behalf of Main Contractor Galliford Try. The Grange project will combine a nursery, infant, junior and high schools as one institution.

The school survived the Government BSF review, which saw the Halton Schools BSF reduced from a £167m building programme down to £50m.

Both projects are scheduled to commence March 2012 and will provide state-of-the-art teaching facilities.</description>
									</item>
					<item>
									<title>Airedale end the Year on a high with a further £15.5m of M&amp;E orders within various sectors</title>
									<link>http://www.airedale.uk.com/news.php#news74</link>
									<guid>http://www.airedale.uk.com/news.php#news74</guid>
									<pubDate>Mon, 23 Jan 2012 15:04:13 GMT</pubDate>
									<description>02/12/11

Airedale Mechanical &amp; Electrical Ltd ended the Year on a high having secured over £15.5 million in mechanical and electrical orders within Education, Commercial, Social Housing, Student Accommodation and Leisure - comprising of the following projects:

Dixon Allerton Academy - on behalf of Wates Construction, 97 Oxford Road - Uxbridge behalf of McLaren Construction, Horton Halls and Wakefield One Leisure Centre - behalf of Willmott Dixon, Phase 2 University of Sussex (Student Accommodation) - on behalf of Ocon Construction, Student Accommodation Winchester on behalf of Osborne Construction and Travel Lodge Manchester on behalf of GMI Construction. 

Airedale\\\\\\\'s Managing Director Mark J Nelson said \\\"it is excellent news to be working with such prestigious clients in this challenging climate.\\\"</description>
									</item>
					<item>
									<title>RIP Super SIC 1987 - 2011</title>
									<link>http://www.airedale.uk.com/news.php#news73</link>
									<guid>http://www.airedale.uk.com/news.php#news73</guid>
									<pubDate>Wed, 26 Oct 2011 12:11:24 GMT</pubDate>
									<description>26/10/11

\"On behalf of the Airedale Group Of Companies we extend our sincere condolences to the family, friends and team of Marco Simoncelli, our thoughts are with you at this difficult time, there are no words to express our heartfelt sympathy\"
 
                                                           \"RIP Super SIC 1987 - 201\"
 
\"Sul nome del gruppo Airedale delle imprese porgiamo i nostri più sincere condoglianze alla famiglia, amici e team di Marco Simoncelli, i nostri pensieri sono con in questo momento difficile, non ci sono parole per esprimere il nostro sincero cordoglio\"

                                                           \"RIP Super SIC 1987-2011\"</description>
									</item>
					<item>
									<title>University of Sheffield iconic Arts Tower</title>
									<link>http://www.airedale.uk.com/news.php#news72</link>
									<guid>http://www.airedale.uk.com/news.php#news72</guid>
									<pubDate>Fri, 08 Jul 2011 08:38:43 GMT</pubDate>
									<description>08/07/11

Following on from the other successful phases of the iconic Arts Tower for The University of Sheffield, Airedale M &amp; E Ltd working closely with BAM Construction have secured the final phase works. 

The final phase includes the refurbishment of the nine lecture theatres located in the lower levels of the building.  The circa 2.5m project consists of new ventilation systems, revised heating and electrical services to the lecture theatres and lower floors. 

The building has been refurbished, whilst occupied, over the last two years, with this final phase due to complete in December 2011.</description>
									</item>
					<item>
									<title>Airedale M&amp;E Ltd secure 3 projects worth nearly 11m</title>
									<link>http://www.airedale.uk.com/news.php#news71</link>
									<guid>http://www.airedale.uk.com/news.php#news71</guid>
									<pubDate>Thu, 07 Jul 2011 09:08:34 GMT</pubDate>
									<description>07/07/11

Working with BAM Construction the UCL Academy in Camden includes state-of-the-art laboratories, a science demonstration theatre and an engineering science suite including workshops.  The academy is designed by Buro Happold with Airedale responsible for the specialist services design and co-ordination of services. The services installation commences in September 2011 and is due to handover for the term commencing September 2012.
 
The Appleton Academy in Wyke, West Yorkshire is a centre of learning build in a circular concept with a central courtyard and community library to create an exciting and inspirational working environment. Airedale M &amp; E Ltd will be working with a Farrans, H &amp; J Martin and Patton joint venture and the BDP design team to deliver the project by September 2012.
 
Finally, Airedale M &amp; E Ltd will be working with Shepherd Construction Limited to provide the New Kitchen Block at HMP Wakefield. Responsible for the design development, installation and commissioning, this facility upgrade will be operational by mid 2012. The project is to be completed with the minimum of disruption to the establishment regimes and management duties.</description>
									</item>
					<item>
									<title>NAMRC - Nuclear Advanced Manufacturing Research Centre</title>
									<link>http://www.airedale.uk.com/news.php#news70</link>
									<guid>http://www.airedale.uk.com/news.php#news70</guid>
									<pubDate>Fri, 01 Apr 2011 11:09:14 GMT</pubDate>
									<description>01/04/11

Airedale M&amp;E Ltd have been awarded the electrical installation package on the Nuclear AMRC, a joint venture with the University of Sheffield, the University of Manchester and a consortium of industry partners. The Nuclear AMRC will play a key role in the first of the UK's new network of Technology Innovation Centres designed to help equip UK industry with the ability to capitalise on future global market opportunities. Airedale will be working with BAM Services Engineering and main contractor BAM to deliver the Offices, Laboratories and Workshop Facilities.
 
The project also includes a rationalisation of the HV/LV systems and a new energy centre.
 
The 1.5m electrical works has a fast-track programme commencing in March 2011 and completion planned for October 2011.</description>
									</item>
					<item>
									<title>Molineux Redevelopment</title>
									<link>http://www.airedale.uk.com/news.php#news69</link>
									<guid>http://www.airedale.uk.com/news.php#news69</guid>
									<pubDate>Fri, 01 Apr 2011 11:02:25 GMT</pubDate>
									<description>01/04/11

Airedale M&amp;E Ltd have been awarded the enabling works, design, installation and commissioning of the M&amp;E services for the redevelopment of the North Stand of Molineux Stadium, the home of Wolverhampton Wanderers Football Club. Airedale will be working with the main contractor Buckingham Construction Group to deliver this 3m M&amp;E project for the start of the 2012/2013 season.
 
Enabling work commenced in February and the main works start with the demolition of the Stan Cullis Stand at the end of the this season (2011/2012), with a state-of-the-art two-tier structure that extends into the open corner of the Steve Bull Stand - starting a stadium bowl design.

The North Stand will include concessions, kiosks, fine dining restaurant and bar,  kitchens, spectator toilets, groundsman facilities and media facilities. Capacity will increase to around 37000 upon completion of this phase of the works.</description>
									</item></channel>
							  </rss>